Distributor case
Welcome to JUNON, the Distributor case supplier in China. We has obtained CCC, CE, CB, and passed ISO9001:2000 international quality system certification. Choose us you will get the best quality and price.
Product Details
Series |
V16 series |
Name |
Distributor case |
Model No. |
V16MCB-12/E |
Installation |
Flush Mounted. |
Material |
1.2mm Cold-Rolled Steel |
Lock Material |
Metal |
Rated Voltage |
400V~ |
Rated current |
125A |
Rated frequency |
60Hz |
IP rating |
IP30 |
MOQ |
300pcs |
Package |
1pc/carton, 490*138*408mm |
Open Angle |
Max.180° |
Phase |
Three-phase |
Brand |
JUNON/OEM |
Product Image
Strong Productive Capacity
1) The factories covers area of 68000m² of Leliu Head office and 80000m²of Jun a branch factory.
2) We have total 2000 employees, and about 100 of them are for research, 100 of them are for quality control.
3) Production capability:
Switch & socket: 800,000 to 1,000,000 pcs per month
Distribution box: 300,000 pcs per month
Distribution board: 30,000 pcs per month
LED lights: 35,000 pcs per month
4) Total production line: 36 lines
5) Total injection machine: 81 pcs
6) Total punching machine: 124 pcs
7) Automatic machine: 130 pcs
8) Testing machine: 30 pcs
9) Dustless workshop equipment: 86 pcs
Installation Instruction
- Fix unit to the wall: Open the front panel of the cover, fix the base of the distribution board into the recess in the wall.
- Fix the incoming device: If the unit is supplied with a separate incoming device (isolator or RCCB), fix this device on the right side of the din rail. Connect the neutral link to this device on the bottom right terminal of the isolator.
- Fix the circuit breakers: Fix all the required circuit breakers onto the din-rail. It is important to clearly mark the circuit identification on the slots provided in the cover of the distribution board.
- Install the bus bar: Undo the bottom terminal screws on all MCBs and the live terminal of the isolator and/or RCD. Insert the bus bar into the terminal cages. Ensure that the bus bar is fully inserted and then tighten all the terminal screws adequately.
- Testing and commissioning: Before the distribution board and the installation of which it forms a part are commissioned they must be tested, in accordance with the requirements of the current edition of requirements for electrical installation published jointly by the British Standard Institute and the Institution of Electrical Engineers.
Samples Details:
1) Samples preparation: within 1-15 working days as per store availability
2) Samples charge: its sample need to be supplied with charge but will refund after receiving firm order with mass production.
3) Samples delivery: normally sent by below international express with customer advised express account No. DHL, TNT, FEDEX, UPS and EMS
PLEASE NOTE: if not and freight charge prepayment need we will charge it before delivery and it will be refunded after receiving firm order with mass production.
Certificates we gained
This is JUNON Distributor case, with very good quality and competitive price which is right for you.